8 May 2026 · 5 min read
This is the question that stalls more backyard projects than budget does. The short answer: many outdoor structures in Victoria do require a building permit, and the process is routine. We'll flag at quote stage where we expect one is needed — the permit itself is arranged through a registered building surveyor, not by us. Here's roughly how it works.
When a permit is generally required
As a rule of thumb, you'll need a building permit for a pergola, verandah or carport once the structure exceeds 20 square metres, is attached to the dwelling, sits within a boundary setback, or is close to easements. Decks generally need a permit once the finished surface is more than 800mm above natural ground level. Overlays — heritage, bushfire, flooding, significant landscape — can change all of this.
- Structure over 20m² or attached to the house
- Deck more than 800mm above ground level
- Within boundary setbacks or over an easement
- Any property with a planning overlay
What the process involves
Engineering computations and a site plan are prepared, then lodged with a registered building surveyor. Where planning approval is also needed — usually because of setbacks or an overlay — that goes to council first. Typical timeframes run from two to six weeks, so it's worth starting that process as early as possible rather than waiting for materials.
Why skipping it costs more
An unpermitted structure will surface at sale time in the section 32, and buyers or their conveyancers will either demand retrospective approval or discount their offer. Retrospective permits cost considerably more than doing it properly the first time, and if the structure doesn't meet standards you may be required to remove it. Insurance claims involving unpermitted structures can also be declined.
The good news
It's a well-worn path. We assess likely permit requirements at quote stage and tell you plainly what your structure will need, so you can engage a registered building surveyor with a clear picture before you commit. Our quote covers the design and construction scope in writing — no surprise line items later.